London Construction & Property Services

Field Road

Fire stopping and Fire prevention for emergency stairwell and carpark areas in Field Road, East London.

Project Information

Gaughan Group successfully completed a comprehensive fire prevention and stopping project focusing on emergency stairwell and carpark areas.

VALUE £500,000
LOCATIONField Road, Leyton, London
DURATION11 months - Ongoing
TYPECommercial Project

Challenges

The project encompassed the removal of all existing timber-framed elements and non-fire-resistant materials in compliance with current health and safety regulations and disposal protocols.

Keys to Success

  • All existing timber frame-built items and non-fire-resistant materials were systematically removed in line with stringent health, safety, and disposal regulations.
  • Walls, boxings, stair treads, and iron gates were rebuilt using intumescent fire products, A1 non-combustible Composite cladding, A1 non-combustible decking, and an A1 aluminium-built frame to ensure enhanced fire resistance.
  • A1 non-combustible rockwool fire batts, A1 non-combustible membrane, and A1 fire-resistant primer and masonry paint were meticulously applied to reinforce fire prevention measures across the project site.
  • Gaughan Group's meticulous execution of the fire prevention and stopping project has significantly bolstered safety measures in the emergency stairwell and carpark areas.